Pipe dredge report8/20/2023 The Pre-Dredge survey plan for Allen Harbor. Dredging continued throughout the week up until Saturday when dense fog initially postponed operations then wind / seas from the west/southwest restricted dredging operations. There are several discharge locations designated by the town of Harwich including Grey Neck Beach and several private residences. Published on: JSand Shifter – Allen Harbor Channel, HarwichÄredging started on June 1st with the Sand Shifter working just outside of the east breakwater in the entrance to Allen Harbor.